Before and After: Pressure Seal Head with severe Solid Particle Erosion (SPE) that we reverse engineered, manufactured and supplied within 2 1/2 weeks. 755 MW Steam Turbine.
Before and After: Bypass Valve Discs from 755 MW GE Steam Turbine (notice the severe SPE before, and anti-friction coating after).
Before and After: Control Valve Rack from 45 MW GE Steam Turbine. Parts where catalogued as they where disassembled. Required parts where manufactured.